top of page
Search

Go-To-Manufacturing

  • kkl779
  • Oct 20, 2020
  • 1 min read

This week we narrowed in on the manufacturing plan for the Pian-Yo-Yo even further. We finalized the molds and toolpaths for each of the injection molded pieces, ran Moldflow simulations on each of these components, and assembled our Go-To-Manufacturing report to layout the details and feasibility of our plan. Finally, we machined our first set of molds for the yo-yo body! We look forward to start machining the next mold sets and injection molding our first yo-yo bodies this week. The Go-To-Manufacturing report and first set of molds can be found below.


 
 
 

Comentarios


Post: Blog2_Post
  • Facebook
  • Twitter
  • LinkedIn

©2020 by The Circle of Fifths

bottom of page